
Washington Electrical Administrator (01): Requirements, Fees, and How to Get Certified
Washington's 01 general electrical administrator certificate: no experience or L&I approval needed, the three-section PSI exam, the 90-day deadline to apply after passing, fees, assignment to a contractor and renewal.
Contents
Washington Electrical Administrator (01): Requirements and How to Get Certified
Every Washington electrical contractor must designate an administrator or a master electrician who answers for its work (RCW 19.28.061). The administrator certificate is the route for owners, managers and estimators who are not master electricians. Here is what the 01 general administrator (AD01) certificate takes.
What an administrator does
The designated administrator makes sure the contractor's electrical work meets Washington's laws and rules, that proper safety procedures are followed, that the required labels, permits and licenses are used, and that corrections from inspectors are made. An administrator must be a member of the firm or a full-time supervisory employee and can be designated for only one contractor at a time.
An administrator certificate does not let you do installation work. For that you also need an electrician certificate.
A general (01) administrator can be assigned to one general electrical contractor or to any specialty contractor. Specialty administrators can serve only a contractor in their specialty.
Eligibility: none
There are no prerequisites. You do not need experience, and you do not need L&I's approval to test: you book directly with PSI.
The exam
Three separately scored sections on the 2020 NEC and Washington law, 70% on each. What is on the exam breaks them down.
| Section | Questions | Time |
|---|---|---|
| NEC and Theory | 65 | 4 hours |
| Washington Codes (RCW 19.28 and WAC 296-46B) | 17 | 1 hour |
| Major Load Calculations | 10 | 2 hours |
Since November 20, 2026 (WAC 296-46B-960), you have two years from your first attempt to pass all three sections. After a failed attempt you wait 14 days; after three failures in the period, 60 days between attempts.
After you pass: 90 days to apply
Your passing score reports are your application. L&I must receive them, with the $160 certificate fee, within 90 days of your last passing score, or you must retake the exam. Processing takes 8 to 10 weeks, and the first certificate lasts 25 to 36 months depending on your birthday.
You can be designated to a contractor when you apply. Assigning yourself later costs $53, and you must tell L&I within 10 days of any change.
Renewal
Certificates renew every three years, on your birthday: $175.70 online or $202.20 by mail. You need 24 hours of continuing education, including at least 8 on NEC code update and 4 on RCW 19.28 and WAC 296-46B. If you renew without your education hours, the certificate goes inactive and you are unassigned from the contractor. More than 90 days late means retaking the exam.
Two changes to watch
- The NEC edition. The exam is on the 2020 NEC until L&I moves it to the 2026 NEC in July 2027.
- The law. The exam rules changed on November 20, 2026, and more WAC 296-46B amendments take effect with the 2026 NEC on December 31, 2026. The Washington Codes section tests the current law.
Getting ready
Try our free 10-question practice test on the 2020 NEC, or see the full Washington Electrical Administrator exam prep. If you are a journeyman, the master electrician certificate also qualifies you to administer a contractor.
Ready to pass Washington Electrical Administrator (01)?
Start your prep with unlimited practice tests and codebook-referenced answers.
Start Studying →
