- References: through November 30, 2026 and from December 1, 2026
- Exam format at a glance
- The content outline
- NFPA 72: application of fire alarm systems
- The NEC: Article 760 and wiring methods
- Occupancies (2021 IBC from December 1, 2026)
- Tennessee law and rules (35 questions, closed book)
- Battery and secondary-power calculations
- Topic-by-topic study plan
- What to do next
What's on the Tennessee Alarm Contractor Exam: Topic Breakdown and Study Plan
The Tennessee Alarm Systems Contractor (Fire Alarm) Qualifying Agent exam is given by PSI. It is 100 questions in 5 hours, open book, and you need 70% to pass. The references change on December 1, 2026, so check which side of that date your exam falls on.
This post covers the official outline, the references for each date, and how to study each area.
References: through November 30, 2026 and from December 1, 2026
PSI's Tennessee Alarm Examinations candidate bulletin (revised 9/3/2026) lists two reference sets:
| Exams through November 30, 2026 | Exams from December 1, 2026 | |
|---|---|---|
| NFPA 72 | 2010 edition | 2019 edition |
| NEC (NFPA 70) | 2011 or 2017 edition (or the Handbook) | "NFPA 70: National Electrical Code", no year given |
| Other books allowed | NFPA 101 Life Safety Code Handbook, 2012 | Ugly's Electrical Reference; International Building Code, 2021 |
| Not allowed in the room | Mike Holt's Illustrated Guide to Basic Electrical Theory; Tennessee Alarm Contractors Licensing Law and Rules | Same |
Which NEC from December 1? The bulletin gives no year. Tennessee has adopted the 2017 NEC statewide (State Fire Marshal's Office), and 2017 is also one of the two editions allowed before December 1, so a 2017 NEC covers you on either date. Our NEC questions cite the 2017 edition.
Tennessee law is closed book. The licensing law and rules are tested, but you may not bring them into the exam room. Learn them before exam day.
Exam format at a glance
| Spec | Value |
|---|---|
| Format | Open book, multiple choice |
| Vendor | PSI Services |
| Booking portal | test-takers.psiexams.com/tnascb |
| Questions | 100 |
| Time limit | 5 hours |
| Passing score | 70% |
| Calculator | Silent, nonprinting, non-programmable allowed |
The content outline
Both outlines have seven areas and 100 questions. From December 1, 2026, "Special Occupancies" becomes "Occupancies" and grows from 10 to 13 questions, and "Special Conditions" drops from 8 to 5:
| Subject area | Through Nov 30, 2026 | From Dec 1, 2026 |
|---|---|---|
| General Knowledge and Theory | 10 | 10 |
| Requirements for Electrical Installation | 5 | 5 |
| Wiring Methods and Materials | 10 | 10 |
| Special Occupancies / Occupancies | 10 | 13 |
| Special Conditions | 8 | 5 |
| Application of Fire Alarm Systems | 22 | 22 |
| State Licensing Laws and Rules | 35 | 35 |
Two things stand out. State law is the largest single area, at 35 questions, and it is the one reference you cannot bring. And roughly a third of the exam is electrical (theory, installation, wiring methods, special conditions), so the NEC matters as much as NFPA 72.
Open-book sounds forgiving, but on PSI's TN Alarm Contractor exam it rewards a different skill set than closed-book exams: reference navigation speed. Candidates who pass first-try know which book holds which type of answer and can find the citation in under a minute. Candidates who fail are usually the ones who treated the open book as a safety net and didn't tab their references in advance.
NFPA 72: application of fire alarm systems
NFPA 72 carries the 22 "Application of Fire Alarm Systems" questions. Use the edition for your exam date (2019 from December 1, 2026). A handful of chapters carry most of the weight:
Chapter 17 — Initiating Devices. Smoke and heat detector spacing, mounting, location requirements. Manual pull stations. Waterflow and tamper. Even open-book, the questions here are designed to be answered quickly if you know where to look — and slowly if you don't.
Chapter 18 — Notification Appliances. Candela ratings, mounting heights, audibility calculations, strobe sync. Look-up-friendly if your tables are tabbed.
Chapter 23 — Protected Premises (Wiring & Circuits). This is the wiring chapter — Class A vs. Class B, pathway designations, survivability levels. Expect a steady stream of questions referencing these definitions.
Chapter 14 — Inspection, Testing, and Maintenance. Frequencies, test methods, documentation. Open-book exams love ITM-frequency questions because they reward candidates who can find the testing table quickly: Table 14.4.3.2 in the 2019 edition (Table 14.4.5 in 2010).
Chapter 12 — Circuits and Pathways / Survivability. Pathway survivability levels (Level 0, 1, 2, 3) — what they mean, where they apply.
The NEC: Article 760 and wiring methods
The National Electrical Code governs how you wire fire alarm circuits, and Article 760 is the section devoted specifically to fire alarm systems. The key concepts:
Power-limited vs. non-power-limited circuits. PLFA vs. NPLFA distinctions, the marking requirements, allowable cable types, and the separation rules between each circuit class and other building wiring.
Allowable wiring methods. Which cable types can be used where (FPL, FPLR, FPLP), conduit fill, support spacing.
Where Article 760 dovetails with NFPA 72 Chapter 23. The two references overlap. Questions sometimes test whether you know which document governs in a conflict — NFPA 72 generally specifies the system, NEC specifies the wiring methods.
Occupancies (2021 IBC from December 1, 2026)
From December 1, 2026, 13 questions cover occupancies, and the 2021 International Building Code replaces the NFPA 101 Handbook on the reference list. Know the occupancy groups in IBC Chapter 3 and where Section 907 requires fire alarm and detection in each.
Tennessee law and rules (35 questions, closed book)
This is the state-specific area, and the one most out-of-state candidates underestimate. It is 35 of the 100 questions, and the law and rules are not allowed in the exam room. Expect questions on:
- The three-tier license structure — Company, Qualifying Agent, Registered Employee. Who holds what, what the fees are, who can sign off on what work.
- The 30-day Registered Employee requirement — every tech must be registered within 30 days of hire. Expect a question.
- Classification definitions — what work falls under fire alarm vs. burglar vs. monitoring.
- Criminal-history disqualifiers under § 62-32-303 — felony categories that prevent licensure.
You can't tab this one, because you can't bring it. Part 3 of Title 62 Ch. 32 (the Alarm Contractors Licensing Act) is short relative to NFPA 72, so read it several times and drill it with practice questions until the answers come from memory.
Battery and secondary-power calculations
A reliable, high-yield calculation topic. Expect at least one full calculation question, sometimes more.
The standard sizing formula:
Battery capacity (Ah) ≥ (standby current × 24 hours) + (alarm current × 5 to 15 minutes, depending on system type)
Then apply derating factors for temperature, age, and aging margin (typically 1.20× safety factor).
What to drill:
- Standby current totals from a device list
- Alarm current totals (usually higher — strobes draw significantly more than supervisory loads)
- The 24-hour standby + 5-minute (most systems) or 15-minute (mass notification / ECS) alarm duration
- Battery selection from a sized result
Calculation questions take 2-3 minutes each. Don't get bogged down on a single calc — flag and move on if you're stuck.
Topic-by-topic study plan
| Week | Focus | References |
|---|---|---|
| 1 | NFPA 72 system design + initiating | Ch. 10, Ch. 17 |
| 2 | NACs, wiring, survivability | NFPA 72 Ch. 18, 23, 12 |
| 3 | NEC Art. 760 + ITM | NEC 760, NFPA 72 Ch. 14 |
| 4 | TN law (from memory) + occupancies + battery calcs + practice | Title 62, IBC Ch. 3 and 907, calc drills |
Spread the Tennessee law reading across all four weeks rather than leaving it to the end: it is 35 questions and closed book. The final week is where the open-book strategy comes together: tab every reference you can bring, time yourself on practice questions, and verify you can find any answer in under 90 seconds.
What to do next
The TN Alarm Contractor exam doesn't reward candidates who plan to read NFPA 72 cover-to-cover during the exam — it rewards candidates who arrive with tabbed references and know where every answer lives.
Our Tennessee Alarm Contractor practice tests cover NFPA 72 (2019), the 2017 NEC, Tenn. Code Title 62 Ch. 32, and battery calculations, with questions tagged to specific references so you can drill reference-navigation speed alongside content. Plans include detailed answer explanations with codebook references.
Want to gauge your readiness first? Take our free 10-question Tennessee Alarm Contractor sample test — no commitment, just a quick calibration on the open-book format.
Ready to pass Tennessee Alarm Contractor (FA)?
Start your prep with unlimited practice tests and codebook-referenced answers.
Start Studying →