Fire Cert Academy
Back to blog
What's on the Chicago Low Voltage Supervising Electrician Exam?

What's on the Chicago Low Voltage Supervising Electrician Exam?

The Chicago Supervising Low Voltage Electrician exam has 100 questions: 25 on electrical principles and OSHA safety and 75 on the Chicago Electrical Code and city law. The outline, Chicago's fire alarm and plenum cabling rules, and how to study.

November 13, 20265 min readChicago Supervising Electrician (Low Voltage)
Contents

What's on the Chicago Low Voltage Supervising Electrician Exam?

The Chicago Supervising Low Voltage Electrician exam has 100 four-option questions in 3 hours, on paper, and you need 70. Continental Testing Services (CTS) publishes the outline in its study guide. It has the same two parts as the General exam, with fewer questions: 25 on electrical principles and practices and 75 on the Chicago Electrical Code.

The low voltage license only covers Class 1, 2 and 3 circuits and communications work, but the exam does not stay inside Articles 725 to 840. Every NEC chapter is on it.

Part I: Electrical Principles and Practices (25 questions)

AreaQuestions
Fundamental concepts3 to 4
Electrical blueprint reading3 to 4
Conductors, conduit and grounding3 to 5
Transformers, delta and wye loads3 to 5
Power factor and volt-amps3 to 5
Service and voltage drops3 to 4
OSHA regulations and workplace safety6 to 8

This part is identical to the General exam's. CTS names the American Electrician's Handbook (16th edition) and 29 CFR 1926 as references, but neither is allowed in the exam room, so you answer from what you know and from the calculator: Ohm's law, power and power factor, delta and wye relationships, transformer current and voltage drop. The OSHA questions come from the construction standard, especially Subpart K on electrical safety.

Part II: Chicago Electrical Code (75 questions)

AreaQuestions
Titles 2, 4 and 13 (Code Supplement)5 to 7
General Provisions (Articles 90 to 110)6 to 8
Wiring and Protection (200s)10 to 12
Wiring Methods and Materials (300s)14 to 16
Equipment for General Use (400s)6 to 8
Special Occupancies (500s)6 to 8
Special Equipment (600s)6 to 8
Special Conditions (700s)6 to 8
Communication Systems (800s)10 to 12

Wiring methods is the largest code area, and communication systems is as large as wiring and protection. The low-voltage articles sit in three of these areas: audio, information technology and similar equipment (640, 645, 650) in the 600s; Class 1, 2 and 3 circuits, fire alarm systems and optical fiber (725, 760, 770) in the 700s; and communications, radio and TV, CATV and network-powered broadband (800 to 840) in the 800s. Our full-length practice exam uses the middle of each range, with the 200s, 400s and 500s at the low end of theirs so the code part totals 75.

Chicago's low-voltage rules

The 2018 Chicago Electrical Code is the 2017 NEC with Chicago's changes in Title 14E of the Municipal Code, in force since March 1, 2018. Several of those changes land squarely on low-voltage work:

When a question turns on one of these rules, the national answer is wrong in Chicago. Tab Articles 725, 760, 770 and 800, and mark where Title 14E rewrites them.

City law: Titles 2, 4 and 13

The 5 to 7 city-law questions come from a CTS handout, "Selected Provisions of Titles 2, 4 and 13," which CTS gives every candidate at the exam and lets you download to study. It covers the Department of Buildings, electrical contractor and supervising electrician licensing (Chapters 4-290 and 4-292), and old Title 13 on electrical permits and inspections, wires on the public way and fines. The handout reflects the code as of December 13, 2017, before the administrative rules moved to Title 14A, so study the handout rather than current Title 14A.

How to study

  1. Tab the 2018 Chicago Electrical Code by article, with extra tabs at 725, 760, 770, 800, 820 and 830 and at the Chicago fire alarm sections. Notes and highlighting are not allowed in the exam book; tabs are.
  2. Do not skip the power chapters. More than 40 of the 75 code questions come from Chapters 1 to 5.
  3. Read the Titles 2, 4 and 13 handout once through. The same copy is in front of you during the exam.
  4. Drill the principles part with a calculator, and practice pace: 100 questions in 3 hours is 1.8 minutes each.

Start with our free, untimed Chicago Low Voltage Supervising Electrician sample test. Every question cites the 2017 NEC, Title 14E, Municipal Code or OSHA section it comes from. With a subscription you can also take full-length practice exams in Timed Exam mode. For eligibility, fees and exam dates, see the requirements.

BC
Brandon Carlton
Founder, Fire Cert Academy

Ready to pass Chicago Supervising Electrician (Low Voltage)?

Start your prep with unlimited practice tests and codebook-referenced answers.

Start Studying →

Related reading

Chicago Low Voltage Supervising Electrician Exam Day: What to Expect

Chicago Low Voltage Supervising Electrician Exam Day: What to Expect

What happens on the day of the Chicago Supervising Low Voltage Electrician exam: the paper format, what to bring, the clean-book and tab rules, the city-law handout CTS gives you, pacing 100 questions in 3 hours, and what happens after.

Nov 13, 2026 · 3 min readChicago Supervising Electrician (Low Voltage)
What's on the Chicago Low Voltage Supervising Electrician Exam?

What's on the Chicago Low Voltage Supervising Electrician Exam?

The Chicago Supervising Low Voltage Electrician exam has 100 questions: 25 on electrical principles and OSHA safety and 75 on the Chicago Electrical Code and city law. The outline, Chicago's fire alarm and plenum cabling rules, and how to study.

Nov 13, 2026 · 5 min readChicago Supervising Electrician (Low Voltage)
Chicago Low Voltage Supervising Electrician License: Requirements and How to Apply

Chicago Low Voltage Supervising Electrician License: Requirements and How to Apply

Who can take Chicago's Supervising Low Voltage Electrician exam, what work a low voltage license covers, how to apply through Continental Testing Services, the 2026 fees, exam dates, the six-month retake wait, and renewal.

Nov 13, 2026 · 4 min readChicago Supervising Electrician (Low Voltage)