Fire Cert Academy
Rhode Island electrician exams

Rhode Island Electrical Contractor (Certificate A / Class A)

Practice exams for the Rhode Island Electrical Contractor (Certificate A / Class A) exam, on the 2023 NEC, in the exam’s format and time limit.

Every plan includes

  • 240+ practice questionsOn the 2023 NEC, across all 11 topic areas
  • Unlimited 80-question timed exams4 h, the same length as the real exam
  • Every answer cites the 2023 NECExplained, with the section it comes from

What’s included

Every plan includes all of it. Plans differ only in how long you have access and how you are billed.

Choose your plan

Same full access on every plan. Pick how long you want it; cancel anytime.

Monthly
$39.99
/month, cancel anytime
Full 240+ question bank and unlimited timed exams
No commitment
Ideal for exam week crunch
Start Monthly
Recommended
6-Month
$149.99
every 6 months, cancel anytime
Full 240+ question bank and unlimited timed exams
$25.00/mo effective
Save 37% vs monthly
Start 6-Month
Lowest /mo
Annual
$229.99
every year, cancel anytime
Full 240+ question bank and unlimited timed exams
$19.17/mo effective
Save 52% vs monthly
Start Annual
✓
7-day money-back guarantee. Not satisfied? Email us within 7 days for a full refund — no questions asked.

How the real exam is built

The real exam: 80 questions in 4 h.

You need 70% on 80 questions in 4 hours. Rhode Island’s Department of Labor and Training publishes no content outline; its study list names only the current state-approved NEC and general trade knowledge. So the area counts below are our own blueprint, not an official one: NEC chapter weighting like comparable state exams, plus electrical theory and calculations for the trade-knowledge side. The real exam is closed book by rule unless the Board permits otherwise, so answer from memory first and use the book only to check.

Certificate A Electrical Contractor exam (area counts are our blueprint)

80 scored · 240 min
  • Branch Circuits, Feeders, Services and Overcurrent Protection12
  • Wiring Methods and Materials10
  • Calculations10
  • Grounding and Bonding8
  • Motors, Motor Circuits and Controllers7
  • General Requirements and Definitions6
  • Equipment for General Use6
  • Special Occupancies6
  • Special Equipment6
  • Electrical Theory and Fundamentals5
  • Special Conditions and Communications Systems4
The Rhode Island Department of Labor and Training does not publish exam pass rates.
Try 10 free questions

About the Rhode Island Electrical Contractor (Certificate A / Class A)

Granted by Rhode Island Department of Labor and Training — Board of Examiners of Electricians

Rhode Island Certificate A (Class A) Electrical Contractor exam, written and given by the Department of Labor and Training: 80 questions in 4 hours on the 2023 NEC (the Rhode Island Electrical Code) and general trade knowledge, closed book by rule, 70% to pass.

80
Questions
4 h
Time limit
70%
Passing score
Rhode Island Department of Labor and Training
Administered by

Eligibility Requirements

At least 12,000 hours (six years) of experience and a Rhode Island Certificate B (Class B) journeyperson license held for at least two years (260-RICR-30-15-7 §7.6; DLT application). Out-of-state contractors qualify the same way, by holding a Rhode Island journeyperson license for two years.

On the 2023 NEC, as Rhode Island adopts it

The Rhode Island Electrical Code is the 2023 NEC since December 1, 2025, and the Board’s rules put the exam on the edition in force on your exam date. Rhode Island changes only a few provisions, all in Article 90 and Chapter 2. Our questions stay off them, so no answer here rests on a rule that reads differently in Rhode Island. The changes:

Topic2023 NEC (national)Rhode Island Electrical Code
Formal interpretations90.6NFPA formal interpretation procedures applyDeleted in Rhode Island
References to the I-codes (IBC, IRC, IFC and others)90.10 (Rhode Island)The model codes as publishedRead as the Rhode Island state codes (building, one- and two-family, fire safety, energy and others)
Common-area circuits in an existing three-family dwelling210.25(B)Common-area circuits may not be supplied from equipment that supplies a dwelling unitSame rule, but common-area smoke and CO alarm circuits in an existing three-family dwelling may be fed from a unit, with written proof of uninterrupted service, until the service is upgraded or a meter is added
Service conductors above a guarded roof230.24(A)Exception No. 5 lets the clearance drop to 3 ft at 300 V or less where the roof area is guarded or isolatedException No. 5 deleted
Meter disconnect ahead of the service equipment230.82(B)One item in the list of supply-side equipmentIts own subsection: interrupting and short-circuit ratings, the “METER DISCONNECT NOT SERVICE EQUIPMENT” marking, grounding and bonding, and a separate service disconnect located per 230.70(A)(1)

Scheduling & Fees

Where to take it

Administered by
Rhode Island Department of Labor and Training
Scheduling window
Mail DLT Professional Regulation the notarized application, ID, employer experience letter and the $75 non-refundable fee; it must arrive at least 15 working days before an exam date. DLT gives the exams itself, first come, first served with limited space, and mails the time and place to each approved applicant. The exam is written and answered in ink, and it is closed book: anyone referring to notes or books without the Board’s permission is disqualified.
Retake policy
You need 70%. With 60% or more you may review your exam with members of the Board. To retake, apply for a later exam.

Fees

Exam application and processing fee (non-refundable)
$75
Certificate A (Class A) electrical contractor license, two years
$240

Keeping Your Certification Active

Renewal requirements

Cycle
Every two years, on your birthday
Continuing education
15 clock hours of Board-approved continuing education each renewal for Certificate A and Certificate B (Class A and B) licensees, covering the currently adopted NEC and ICC codes (R.I. Gen. Laws 5-6-20.1). Late renewal adds $12 a month; a license not renewed within two years of expiring is forfeited and needs a new exam (5-6-20).

Reciprocity

Rhode Island has no electrician reciprocity. An out-of-state contractor first earns a Rhode Island journeyperson license by exam and holds it for two years before taking the contractor exam.

Sources: 260-RICR-30-15-7: Board of Examiners of Electricians, Rules for Licensing and Examinations · 510-RICR-00-00-5: Rhode Island Electrical Code (2023 NEC, effective December 1, 2025) · RI DLT: Electrician Application Instructions and Fees (2025) · RI DLT: Trade License Exam Information · RI DLT: Trade License Exam Study Material · R.I. Gen. Laws Chapter 5-6: Electricians

Frequently asked questions

How is the Rhode Island Electrical Contractor (Certificate A) exam structured?+

Like the journeyperson exam: 80 questions in 4 hours, written by DLT and the Board of Examiners of Electricians, answered in ink, closed book by rule unless the Board permits otherwise, 70% to pass, on the 2023 NEC and general trade knowledge. A contractor plans and runs the work, so our area blueprint gives load calculations, motors, and special occupancies and equipment more weight than the journeyperson blueprint.

Is Certificate A the same as the Class A license?+

Yes. The Board’s rules call the electrical contractor license Certificate A; it is widely known as the Class A license. It is the step after Certificate B (Class B), the journeyperson license, and you must hold Certificate B for two years before you apply.

What do I need before I can sit the exam?+

At least 12,000 hours (six years) of experience and a Rhode Island Certificate B (Class B) journeyperson license held for at least two years. An out-of-state contractor qualifies the same way: hold a Rhode Island journeyperson license for two years and have six years of experience. The application fee is $75, and the Certificate A license costs $240 for two years once you pass.

What does a Certificate A license allow?+

It lets a person, firm or corporation carry on the business of electrical contracting. On its own it does not let the holder personally do the wiring; that takes a journeyperson license, which every Certificate A holder already has. A firm or corporation is licensed through the member or officer who passed the exam.

Which code edition is the exam on?+

The 2023 NEC. Rhode Island adopted it as the Rhode Island Electrical Code effective December 1, 2025 (before that, the 2020 NEC), and the Board’s rules base the exam on the edition adopted at the time you test. No move to the 2026 NEC has been announced. Every question here cites the 2023 section.

Is the exam open book or closed book?+

Closed book by rule. Under 260-RICR-30-15-7, anyone found referring to notes or books during the exam, “except by permission by the board,” is disqualified. DLT does not publish whether the Board allows the code book at a given sitting, and prep providers disagree, so plan for closed book and ask DLT at (401) 462-8580 when your exam notice arrives. Answers are written in ink.

How do I use this practice exam for a closed-book test?+

Answer each question before you look anything up. Theory, definitions, the ampacities you use every day, box fill, grounding and the common dwelling rules should come from memory, and the area scores show where you are weak. Every explanation names the 2023 NEC section, so check it afterward and learn the rule, not just the answer.

Does Rhode Island publish an exam outline?+

No. The exam is 80 questions in 4 hours, but DLT’s study material for electricians lists only the current state-approved NEC and “General Trade Knowledge,” with no content outline or area weights. The area counts in our practice exam are our own blueprint: NEC chapter weighting like comparable state exams, plus electrical theory and calculations. Treat them as a study guide, not the real split.

Are Rhode Island laws or rules on the exam?+

DLT documents no law or business section for the electrician exams; its study list is the NEC and general trade knowledge. Rhode Island’s changes to the 2023 NEC are few: it deletes 90.6, reads the I-codes as Rhode Island’s own codes, adds a three-family smoke and CO alarm exception to 210.25, deletes Exception No. 5 to 230.24(A), and rewrites 230.82 on supply-side equipment and meter disconnects.

How do I schedule the exam?+

Mail DLT Professional Regulation the notarized application with the $75 non-refundable fee and your documents. Applications must arrive at least 15 working days before an exam date. DLT gives the exams itself, first come, first served with limited space, and mails you the time and place once you are approved. Only approved applicants are admitted.

What happens if I fail?+

You need 70%. With 60% or more you may review your exam with members of the Board. To try again, apply for a later exam; check with DLT whether a new application fee applies.

How often do I renew?+

Every two years, on your birthday. Certificate A and Certificate B renewals need 15 clock hours of Board-approved continuing education covering the currently adopted NEC and ICC codes. A late renewal adds $12 a month, and a license not renewed within two years of expiring is forfeited, so you would need to apply and test again.

Ready to pass your exam?

Practice the full exam on the current code, with every calculation worked out.

Start Studying Today →