One exam, 100 questions
You need 70% overall. Calculations sit inside the outline areas rather than in a separate portion, and our full-length practice exam draws from each area in the same proportions.
Wyoming Master Electrician (701)
100 scored · 300 min- General Knowledge12
- Services16
- Feeders4
- Branch Circuits and Conductors16
- Wiring Methods and Materials19
- Equipment and Devices10
- Control Devices3
- Motors and Generators8
- Special Occupancies, Equipment, and Conditions12
On the 2023 NEC
Wyoming enforces the 2023 NEC, and ICC's Wyoming electrician exams test it. Study material written for earlier editions numbers these rules differently; every question here cites the 2023 section.
| Topic | Earlier editions | 2023 NEC |
|---|---|---|
| Non-dwelling general lighting unit loads220.42 | Table 220.12 | Table 220.42(A) |
| Lighting load demand factors220.45 | Table 220.42 | Table 220.45 |
| Non-dwelling receptacle demand factors220.47 | Table 220.44 | Table 220.47 |
| EV charging load in a load calculation220.57 | No rule | 7,200 VA or the nameplate, whichever is larger |
| Class 1 remote-control and signaling circuitsArticles 722, 724 | Article 725 | Article 724 (general rules in Article 722) |
What's Included
Every plan gets the same full-access study library.
Frequently asked questions
How is the Wyoming Master Electrician exam structured?+
ICC exam 701: 100 questions in 5 hours, open book. Wyoming requires 75% on the master exam, higher than the 70% for journeymen. It follows the national ICC master outline, which weighs services, branch circuits, wiring methods and general knowledge most heavily.
Which code edition is the exam on?+
The 2023 NEC. It is the edition Wyoming enforces, and ICC's Wyoming electrician exams reference it, along with Ugly's Electrical Reference. Older study material numbers several load-calculation rules differently.
Is it open book?+
Yes. You may use the 2023 NEC, Ugly's Electrical Reference (any edition) and, if you prefer, the hardcover NEC Handbook. ICC gives the exams at Pearson VUE test centers for $115, and you must wait 10 days after a failed attempt.
How do I renew, and what continuing education is required?+
Journeyman and master licenses run about three years. You need 16 hours of board-approved continuing education per license period, at least 8 of them on the NEC. There is a 45-day late window with a $50 fee; after that you must retest.
What do I need before I can sit the exam?+
16,000 hours (eight years) of experience, 8,000 of them as a licensed journeyman, plus 576 classroom hours from an approved apprenticeship. A new master license is $200. An electrical contractor must employ a full-time master as its master of record.
Can I use a license from another state?+
Wyoming has master reciprocity with Idaho, South Dakota and Iowa only, for licenses earned by exam (75% or better) and held at least a year.
Ready to pass your exam?
Practice the full exam on the current code, with every calculation worked out.