South Dakota Electrical Contractor
Practice exams for the South Dakota Electrical Contractor exam, on the 2023 NEC, weighted like the real outline.
Every plan includes
- 450+ practice questionsOn the 2023 NEC, across all 9 content areas
- Unlimited 100-question timed exams5 h, the same length as the real exam
- Every answer cites the 2023 NECExplained, with the section it comes from
What’s included
Every plan includes all of it. Plans differ only in how long you have access and how you are billed.
- Custom study sessionsPick how many questions and which areas to drill, and study untimed.
- Explanations that cite the codeEvery answer says why, with the 2023 NEC section it comes from.
- Weak-area analyticsYour results by area show what to study next.
- Real human supportEmail us any time and a person answers.
Choose your plan
Same full access on every plan. Pick how long you want it; cancel anytime.
How the real exam is built
The real exam: 100 questions across 9 areas in 5 h. Our timed exams use the same areas and weights.
You need 70% overall. Calculations sit inside the outline areas rather than in a separate portion.
South Dakota Electrical Contractor (530)
100 scored · 300 min- General Knowledge12
- Services16
- Feeders4
- Branch Circuits and Conductors16
- Wiring Methods and Materials19
- Equipment and Devices10
- Control Devices3
- Motors and Generators8
- Special Occupancies, Equipment, and Conditions12
About the South Dakota Electrical Contractor
Granted by South Dakota Electrical Commission
South Dakota Electrical Contractor exam (ICC 530_SD, Pearson VUE): 100 questions in 5 hours, open book, on the 2023 NEC; 70% to pass. Same outline as the national ICC R16 master exam.
Eligibility Requirements
At least two years (4,000 hours) as a licensed journeyman under an electrical contractor, with at least one year (2,000 hours) in commercial wiring. A Class B electrician can qualify with one year of commercial Class B experience under a licensed contractor.
Don't have the hours yet?
Register with the South Dakota Electrical Commission as an apprentice electrician ($20 every two years); your experience starts counting the day the Commission receives your application.
On the 2023 NEC since December 2, 2024
Study material written for the previous edition teaches these wrong. Every question here is grounded in the 2023 NEC.
| Topic | Previous edition | 2023 NEC |
|---|---|---|
| Non-dwelling general lighting unit loads220.42 | Table 220.12 | Table 220.42(A) |
| Lighting load demand factors220.45 | Table 220.42 | Table 220.45 |
| Non-dwelling receptacle demand factors220.47 | Table 220.44 | Table 220.47 |
| EV charging load in a load calculation220.57 | No rule | 7,200 VA or the nameplate, whichever is larger |
| Class 1 remote-control and signaling circuitsArticles 722, 724 | Article 725 | Article 724 (general rules in Article 722) |
Scheduling & Fees
Where to take it
- Administered by
- ICC (Pearson VUE)
- Scheduling window
- Once the Electrical Commission approves your application you have 90 days to test, or you reapply and pay the $60 again. Wait 24–48 hours after approval before booking.
- Retake policy
- After a failed exam you must wait 30 days to retest; after a second failure, 90 days before each later attempt.
Fees
- Commission application fee
- $60
- ICC exam fee (Pearson VUE)
- $115
- Electrical contractor license (2 years)
- $200
- Undertaking deposit (with the $10,000 undertaking)
- $50
Keeping Your Certification Active
Renewal requirements
- Cycle
- Every 2 years (all licenses expire June 30 of even-numbered years)
- Continuing education
- 16 hours — At least half (8 hours) must be on the National Electrical Code, and no more than 8 hours may come from Commission pre-approved online or correspondence courses.
Reciprocity
South Dakota pairs its electrical contractor license with the master license in Arkansas, Idaho, Iowa, Montana, New Hampshire and Texas, the contractor license in Minnesota, Nebraska, North Dakota and Wyoming, and Oklahoma's unlimited contractor license.
Sources: ICC South Dakota Contractor/Trades Examination Information Bulletin (Aug 19, 2025) · ARSD 20:44 — South Dakota Electrical Commission rules · South Dakota DLR — Electrical licensing · South Dakota DLR — Reciprocal agreements for licensure · South Dakota DLR — Undertaking and insurance requirement
Frequently asked questions
How is the South Dakota Electrical Contractor exam structured?+
ICC exam 530: 100 questions in 5 hours, open book, and you need 70%. South Dakota has no master title: the electrical contractor license is the master-level license, and its exam follows the national ICC master outline.
Which code edition is the exam on?+
The 2023 NEC. South Dakota's exams moved to the 2023 edition on December 2, 2024, and the state applies the 2023 NEC, with its amendments, to installations.
Is it open book, and how do I schedule?+
Yes: the 2023 NEC, Ugly's Electrical Reference (any edition) and, if you prefer, the hardcover NEC Handbook. Apply to the South Dakota Electrical Commission first ($60); once approved you have 90 days to test with ICC at a Pearson VUE center ($115). You need 70%. After a failed attempt the state requires a 30-day wait, and 90 days after a second failure.
How do I renew?+
Every South Dakota electrical license expires June 30 of even-numbered years. You need 16 hours of continuing education per two-year cycle, at least 8 on the NEC and no more than 8 online or by correspondence.
What do I need before I can sit the exam?+
Two years as a licensed journeyman, at least one in commercial work, or one year of commercial work as a Class B electrician. The license is $200 for two years and needs a $10,000 bond and liability insurance unless your employer carries them.
Can I use a license from another state?+
South Dakota pairs its electrical contractor license with the master license in Arkansas, Idaho, Iowa, Montana, New Hampshire and Texas; with the contractor license in Minnesota, North Dakota, Nebraska and Wyoming; and with the unlimited electrical contractor license in Oklahoma.
Study guides for this exam

South Dakota Electrical Contractor Exam Day: ICC at Pearson VUE, Your Books, and Pacing 5 Hours
What to expect on the South Dakota electrical contractor exam (ICC 530) at a Pearson VUE center: the 90-day testing window, the 2023 NEC, Ugly's and NEC Handbook you may use, pacing 100 questions in 5 hours, the 70% pass mark and the retest waits.

What's on the South Dakota Electrical Contractor Exam? All 9 Areas and How to Study Them
The ICC outline for the South Dakota electrical contractor exam (530): 100 questions across 9 areas, with more weight than the journeyman exam on general knowledge, services and motors, on the 2023 NEC — and a study plan built on the weights.

South Dakota Electrical Contractor License: Requirements, Experience, and How to Apply
What the South Dakota Electrical Commission requires for the electrical contractor license, the state's master-level license: journeyman or Class B experience, the $115 ICC exam, the $200 license, bond and insurance, renewal and reciprocity.
Ready to pass your exam?
Practice the full exam on the current code, with every calculation worked out.
Start Studying Today →