Practice the Georgia Electrical Contractor Class I exam the way it is given — 140 questions weighted like the real outline, on the 2023 NEC, with every answer explained and cited.
One exam, 140 questions
You need a scaled score of 70 on the whole exam. These are the question counts in PSI’s bulletin: 30 on regulations, laws and administration and 110 technical, plus 15 unscored pretest questions. Our full-length practice exam draws from each area in the same proportions, and leaves out the three-phase, DC-machine and transformer-bank tasks the bulletin marks Class II only.
Georgia Electrical Contractor Class I exam
140 scored · 480 min- Comply with Laws10
- Comply with Regulations9
- Administrative Requirements6
- Plan and Organize Work5
- Maintain Basic Electrical Circuits21
- Electrical Controls and Devices22
- DC and AC Rotating Equipment9
- Transformers7
- Interior Electrical Systems30
- Special Equipment, Conditions, and Locations21
155 items on the paper; 15 are unscored pretest items.
About the Georgia Electrical Contractor Class I
Granted by Georgia State Construction Industry Licensing Board, Division of Electrical Contractors
Georgia Division of Electrical Contractors Class I (Restricted) exam (PSI): 140 open-book questions, 30 on regulations, laws and administration and 110 technical, with a passing scaled score of 70. Class I covers single-phase work up to 400 amperes on single-family and small multifamily buildings. Questions follow the 2023 NEC and Georgia licensing law.
Eligibility Requirements
Under the 2026 law: three years of full-time experience covering at least five of seven listed work areas plus load calculations, or a two-year electrical diploma and two years of experience, or a Department of Labor apprenticeship; with a sworn experience affidavit and a criminal background check. The Board’s rule (121-3-.01) still states the older requirements, so confirm with the Division.
On the 2023 NEC, with the Georgia amendments
Both Georgia contractor exams list the 2023 NEC, the edition Georgia has enforced since January 1, 2025. Georgia amends a handful of its rules, mostly scaling back the 2023 GFCI and AFCI expansions in 210.8 and 210.12, and two more amendments take effect January 1, 2027. Our questions cite the 2023 section and stay off the rules Georgia changed. Study material written for the 2020 edition numbers these rules differently.
| Topic | 2020 NEC | 2023 NEC |
|---|---|---|
| Non-dwelling general lighting unit loads220.42 | Table 220.12 | Table 220.42(A) |
| Lighting load demand factors220.45 | Table 220.42 | Table 220.45 |
| Non-dwelling receptacle demand factors220.47 | Table 220.44 | Table 220.47 |
| EV charging load in a load calculation220.57 | No rule | 7,200 VA or the nameplate, whichever is larger |
| Class 1 remote-control and signaling circuitsArticles 722, 724 | Article 725 | Article 724 (general rules in Article 722) |
What's Included
Every plan gets the same full-access study library.
Scheduling & Fees
Where to take it
- Administered by
- PSI
- Phone
- (855) 898-0711
- Reschedule policy
- One free reschedule if you ask at least two business days before the exam. Arriving more than 15 minutes late forfeits the exam and the fee, and fees are not refundable.
- Retake policy
- You need a scaled score of 70. After two failed attempts, Georgia requires a Board-approved review course before a third attempt; no further course is required after that.
Keeping Your Certification Active
Renewal requirements
- Cycle
- Every two years, with a 31-day late-renewal period after the license expires
- Continuing education
- The Division sets the continuing education required for renewal and approves the courses, which must be offered online or by home study and outside normal work hours. Hours do not carry forward to the next renewal.
Reciprocity
State law lets the Division grant a license to someone licensed in another state with substantially equivalent requirements, at its discretion. The Division’s FAQ says it offers no reciprocity agreements as of May 2026, so ask before you apply.
Sources: PSI Candidate Information Handbook, Georgia Division of Electrical Contractors (bulletin 4783) · Georgia Division of Electrical Contractors FAQ · SB 553 (2026): O.C.G.A. Title 43, Chapter 14 as reenacted · Ga. Comp. R. & Regs. 121-2-.06 — Review Course for Re-examination
Frequently asked questions
What does a Class I license let me do?+
Class I is the restricted license. Under Georgia law since July 1, 2026 (SB 553), it covers single-family homes of up to three levels and multifamily buildings of up to two levels, with single-phase services of not more than 400 amperes. The Board’s current rule still describes Class I as single-phase work of not more than 200 amperes, so check with the Division before you bid near that limit.
What do I need before I can sit the Class I exam?+
Under the 2026 law: three years of full-time electrical experience covering at least five of the seven listed work areas plus load calculations, or a two-year electrical diploma with two years of experience, or a Department of Labor apprenticeship. You submit a sworn experience affidavit and a criminal background check. The Board’s rule has not yet been updated to match, so confirm the current requirement with the Division when you apply.
Which code edition is the exam on?+
The 2023 NEC. It is on PSI’s reference list for exams through December 31, 2026, and it has been Georgia’s state minimum electrical code since January 1, 2025, with Georgia amendments revised January 1, 2026. No move to the 2026 NEC has been announced; PSI publishes a new reference list each year.
Is it open book? What can I bring?+
Yes, but only the books on PSI’s reference list: the 2023 NEC (or the NEC Handbook), the American Electricians’ Handbook (17th edition), Ugly’s Electrical References (2023), Printreading Based on the 2020 NEC, the NASCLA Contractors Guide for the Georgia Construction Industry Licensing Board (5th edition), the IRS Employer’s Tax Guide (Circular E) and OSHA’s construction standards (29 CFR 1926). Highlighting, underlining and permanent tabs are allowed; handwritten notes and pasted-in material are not. Calculators must be silent and non-programmable, without alpha keys or printing.
How is the exam scored?+
You need a final scaled score of 70, not 70% of the raw questions: PSI adjusts the raw score for the difficulty of your form. Unscored pretest questions are mixed in, so the exam you sit is longer than the 140 that count. You get a pass or fail and your scaled score at the test center, and failing candidates also see subscores by content area.
What happens if I fail twice?+
After two failed attempts, Georgia requires a Board-approved review course before a third attempt. After that, no further course is required.
Who gives the exam, and how do I schedule?+
PSI, at its test centers by appointment, Monday to Saturday. The Board approves your application first and notifies PSI, and PSI then sends scheduling instructions. You get one free reschedule if you ask at least two business days ahead; if you arrive more than 15 minutes late, you forfeit the exam and the fee. Bring two IDs, one a current government photo ID.
How often do I renew?+
Georgia licenses run for two years and are renewed every two years. You can renew late within 31 days after the license expires, with a late fee. The Division sets the continuing education you need, and unused hours do not carry forward to the next renewal.